Pages that link to "Item:Q3159683"
From MaRDI portal
The following pages link to Joint optimization of preventive maintenance and inventory control in a production line using simulation (Q3159683):
Displaying 10 items.
- Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale (Q859918) (← links)
- A hybrid simulation-based optimization framework supporting strategic maintenance development to improve production performance (Q2333016) (← links)
- Joint optimization of \(\overline{X}\) control chart and preventive maintenance policies: a discrete-time Markov chain approach (Q2355868) (← links)
- A decomposition method by interaction prediction for the optimization of maintenance scheduling (Q2675640) (← links)
- Joint maintenance and spare component provisioning policy for \(k\)-out-of-\(n\) systems (Q2873832) (← links)
- Analysis of joint maintenance and production policies under a subcontracting constraint (Q3541188) (← links)
- Optimal control of manufacturing flow and preventive maintenance (Q4886520) (← links)
- Solving the Production and Maintenance Optimization Problem by a Global Approach (Q5357763) (← links)
- Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game (Q5359052) (← links)
- Preventive maintenance of manufacturing systems under environmental constraints (Q5444488) (← links)