Pages that link to "Item:Q3180139"
From MaRDI portal
The following pages link to Robust scheduling of multi-stage flow shop under machine breakdowns following expect-risk rule (Q3180139):
Displaying 4 items.
- A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms (Q342413) (← links)
- Risk measure of job shop scheduling with random machine breakdowns (Q1654341) (← links)
- Optimizing makespan and stability risks in job shop scheduling (Q2664315) (← links)
- An improved hybrid metaheuristics and rule-based approach for flexible job-shop scheduling subject to machine breakdowns (Q6048632) (← links)