Pages that link to "Item:Q3184454"
From MaRDI portal
The following pages link to An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks (Q3184454):
Displaying 12 items.
- ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times (Q337126) (← links)
- Multiprocessor task scheduling in multistage hybrid flowshops: a hybrid artificial bee colony algorithm with bi-directional planning (Q502419) (← links)
- Hybrid flowshop scheduling with machine and resource-dependent processing times (Q534872) (← links)
- Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates (Q614053) (← links)
- Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop. (Q1399584) (← links)
- Hybrid flow-shop scheduling problems with multiprocessor task systems. (Q1410328) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- Minimizing shifts for personnel task scheduling problems: a three-phase algorithm (Q2514834) (← links)
- Climbing Depth-Bounded Adjacent Discrepancy Search for Solving Hybrid Flow Shop Scheduling Problems with Multiprocessor Tasks (Q3003281) (← links)
- An iterated greedy algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times (Q5172564) (← links)
- Comparison of lot streaming division methodologies for multi-objective hybrid flowshop scheduling problem by considering limited waiting time (Q6593195) (← links)