Pages that link to "Item:Q320679"
From MaRDI portal
The following pages link to Dispatching strategies for managing uncertainties in automated manufacturing systems (Q320679):
Displaying 5 items.
- Rescheduling on identical parallel machines with machine disruptions to minimize total completion time (Q322965) (← links)
- Short-term capacity adjustment with offline production for a flexible manufacturing system under abnormal disturbances (Q1599330) (← links)
- A closed-loop model of a multi-station and multi-product manufacturing system using bond graphs and hybrid controllers (Q1751691) (← links)
- Optimisation of the transmission of disruptions in assembly systems (Q3055236) (← links)
- Scheduling wagons to unload in bulk cargo ports with uncertain processing times (Q6068691) (← links)