Pages that link to "Item:Q322969"
From MaRDI portal
The following pages link to The two-machine flowshop total completion time problem: branch-and-bound algorithms based on network-flow formulation (Q322969):
Displaying 11 items.
- A matheuristic approach for the two-machine total completion time flow shop problem (Q744632) (← links)
- Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation (Q922280) (← links)
- The two-machine total completion time flow shop problem (Q1266536) (← links)
- Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. (Q1406627) (← links)
- An improved branch-and-bound algorithm for the two machine total completion time flow shop problem (Q1604072) (← links)
- Combining dynamic programming with filtering to solve a four-stage two-dimensional guillotine-cut bounded knapsack problem (Q1662642) (← links)
- Two-machine flowshop scheduling with a secondary criterion (Q1870802) (← links)
- The two-machine flowshop total completion time problem: improved lower bounds and a branch-and-bound algorithm (Q1876196) (← links)
- Polynomial lower bounds for the two-machine flowshop problem with sequence-independent setup times (Q2861538) (← links)
- Exact Multiple Sequence Alignment by Synchronized Decision Diagrams (Q4995098) (← links)
- Enhanced lower bounds and exact procedures for total completion time minimization in a two‐machine permutation flowshop with release dates (Q6066663) (← links)