Pages that link to "Item:Q323490"
From MaRDI portal
The following pages link to Admission and inventory control of a single-component make-to-order production system with replenishment setup cost and lead time (Q323490):
Displaying 12 items.
- On the admission control and demand management in a two-station tandem production system (Q542563) (← links)
- Admission policies for the customized stochastic lot scheduling problem with strict due-dates (Q545109) (← links)
- Decision of lead-time compression and stable operation of supply chain (Q1694237) (← links)
- Optimal control of a continuous-time \(W\)-configuration assemble-to-order system (Q1754268) (← links)
- Managing an integrated production and inventory system selling to a dual market: long-term and walk-in (Q1754316) (← links)
- Optimal and near-optimal inventory control policies for a make-to-order inventory-production system (Q1848620) (← links)
- Reinforcement learning for joint pricing, lead-time and scheduling decisions in make-to-order systems (Q1926824) (← links)
- Joint client selection and contract design for a risk-averse commodity broker in a two-echelon supply chain (Q2070715) (← links)
- Remanufacturing of multi-component systems with product substitution (Q2140272) (← links)
- A hybrid manufacturing system with demand for intermediate goods and controllable make-to-stock production rate (Q2160515) (← links)
- Inventory policies for a make‐to‐order system with a perishable component and fixed ordering cost (Q3621920) (← links)
- Inventory rationing, admission control, and production capacity allocation in a make-to-stock/make-to-order manufacturing system (Q6659829) (← links)