Pages that link to "Item:Q331766"
From MaRDI portal
The following pages link to Capacitated dynamic production and remanufacturing planning under demand and return uncertainty (Q331766):
Displaying 19 items.
- Remanufacturing production planning with compensation function approximation method (Q299716) (← links)
- Optimal production planning for a multi-product closed loop system with uncertain demand and return (Q609812) (← links)
- A system dynamics model for dynamic capacity planning of remanufacturing in closed-loop supply chains (Q850285) (← links)
- Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution (Q850636) (← links)
- The impact of two-product joint lifecycles on capacity planning of remanufacturing networks (Q1039786) (← links)
- Capacitated dynamic lot sizing problems in closed-loop supply chain (Q1042061) (← links)
- A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning (Q1675586) (← links)
- Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs (Q1734341) (← links)
- Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints (Q1754288) (← links)
- The value of regulating returns for enhancing the dynamic behaviour of hybrid manufacturing-remanufacturing systems (Q1999397) (← links)
- Robust formulations for economic lot-sizing problem with remanufacturing (Q2028886) (← links)
- Towards circular economy in production planning: challenges and opportunities (Q2189927) (← links)
- A multi-stage stochastic integer programming approach for a multi-echelon lot-sizing problem with returns and lost sales (Q2289944) (← links)
- Editorial. Quantitative approaches in production management (Q2302441) (← links)
- Capacitated replenishment and disposal planning for multiple products with resalable returns (Q2393488) (← links)
- Management of returned products to a remanufacturing facility considering arrival uncertainty and priority processing (Q2627515) (← links)
- A mixed integer programming formulation for the stochastic lot sizing problem with controllable processing times (Q2668748) (← links)
- A concave-cost production planning problem with remanufacturing options (Q5318285) (← links)
- Design of a multi echelon product recovery embeded reverse logistics network for multi products and multi periods (Q6170575) (← links)