Pages that link to "Item:Q3320106"
From MaRDI portal
The following pages link to A note on the two machine job shop with exponential processing times (Q3320106):
Displaying 4 items.
- An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns (Q1598772) (← links)
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures (Q2475628) (← links)
- Minimizing the Makespan and Flowtime in Two-Machine Stochastic Open Shops (Q5485388) (← links)
- Dynamic scheduling in manufacturing systems using Brownian approximations (Q5955769) (← links)