Pages that link to "Item:Q3340472"
From MaRDI portal
The following pages link to Note—On “Optimizing Field Repair Kits Based on Job Completion Rate” (Q3340472):
Displaying 7 items.
- Single period, single product newsvendor model with random supply shock (Q596269) (← links)
- Multiple period repair kit problem with a job completion criterion: A case study (Q1129889) (← links)
- Inventory control of service parts in the final phase: A central depot and repair kits (Q1600888) (← links)
- The repair kit problem with positive replenishment lead times and fixed ordering costs (Q1753639) (← links)
- The repair kit problem with imperfect advance demand information (Q2171602) (← links)
- Expected time delay in multi-item inventory systems with correlated demands (Q4700650) (← links)
- The added value of advance demand information for the planning of a repair kit (Q6100688) (← links)