Pages that link to "Item:Q336779"
From MaRDI portal
The following pages link to Determining operations affected by delay in predictive train timetables (Q336779):
Displaying 7 items.
- An iterative approach for reducing the impact of infrastructure maintenance on the performance of railway systems (Q322829) (← links)
- Determining operations affected by delay in predictive train timetables (Q336779) (← links)
- A new constraint programming approach for optimising a coal rail system (Q523170) (← links)
- Optimal allocation of buffer times to increase train schedule robustness (Q1752165) (← links)
- Sensitivity analysis of a railway station track layout with respect to a given timetable (Q1806663) (← links)
- Managing and preventing delays in railway traffic by simulation and optimization (Q2776474) (← links)
- Testing schedule performance and reliability for train stations (Q3156590) (← links)