Pages that link to "Item:Q337017"
From MaRDI portal
The following pages link to Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times (Q337017):
Displaying 7 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Minimizing total tardiness on a two-machine re-entrant flowshop (Q1042154) (← links)
- Multi-family scheduling in a two-machine reentrant flow shop with setups (Q2467261) (← links)
- Two machines flow shop with reentrance and exact time lag (Q2805477) (← links)
- Algorithms for a two‐machine flowshop problem with jobs of two classes (Q6090515) (← links)
- Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem (Q6164382) (← links)
- Robust scheduling in a two-machine re-entrant flow shop to minimise the value-at-risk of the makespan: branch-and-bound and heuristic algorithms based on Markovian activity networks and phase-type distributions (Q6588502) (← links)