Pages that link to "Item:Q337592"
From MaRDI portal
The following pages link to Determining the timing of project control points using a facility location model and simulation (Q337592):
Displaying 6 items.
- Optimal timing of project control points (Q1590030) (← links)
- Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis (Q1736812) (← links)
- Using the generalized maximum covering location model to control a project's progress (Q2183555) (← links)
- The impact of a limited budget on the corrective action taking process (Q2189899) (← links)
- Using earned value management and schedule risk analysis with resource constraints for project control (Q2242244) (← links)
- Formulation and solution of an optimal control problem for industrial project control (Q2288881) (← links)