Pages that link to "Item:Q342399"
From MaRDI portal
The following pages link to A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry (Q342399):
Displaying 9 items.
- Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods (Q1979194) (← links)
- Optimal sales and operations planning for integrated steel industries (Q2171325) (← links)
- An integrated approach based on fuzzy inference system for scheduling and process planning through multiple objectives (Q2190264) (← links)
- Fuzzy chance constrained linear programming model for optimizing the scrap charge in steel production (Q2426524) (← links)
- Multi-choice multi-objective mathematical programming model for integrated production planning: a case study (Q2872638) (← links)
- (Q3081950) (← links)
- Robust semi-infinite interval-valued optimization problem with uncertain inequality constraints (Q5057375) (← links)
- Multi-objective operation optimization of continuous production process with safety constraints (Q5381222) (← links)
- Supporting strategy selection in multiobjective decision problems under uncertainty and hidden requirements (Q6106984) (← links)