The following pages link to (Q3426435):
Displaying 3 items.
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- On project scheduling with irregular starting time costs (Q5945382) (← links)