Pages that link to "Item:Q3458814"
From MaRDI portal
The following pages link to Preemptive scheduling in a two-stage supply chain to minimize the makespan (Q3458814):
Displaying 5 items.
- Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan (Q319276) (← links)
- Discrete and continuous-time formulations for dealing with break periods: preemptive and non-preemptive scheduling (Q1999390) (← links)
- Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time (Q2342682) (← links)
- (Q3132646) (← links)
- Multi-Objective Optimization and Multi-Attribute Decision Making for a Novel Batch Scheduling Problem Based on Mould Capabilities (Q5270518) (← links)