Pages that link to "Item:Q3503570"
From MaRDI portal
The following pages link to A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models (Q3503570):
Displaying 5 items.
- Medium range optimization of copper extraction planning under uncertainty in future copper prices (Q297027) (← links)
- Optimization-based heuristics for underground mine scheduling (Q299816) (← links)
- Optimizing a mineral value chain with market uncertainty using Benders decomposition (Q1755250) (← links)
- Short-term planning optimization model for underground mines (Q2289891) (← links)
- A matheuristic for tactical locomotive and driver scheduling for the swiss national railway company SBB Cargo AG (Q6201534) (← links)