Pages that link to "Item:Q3569929"
From MaRDI portal
The following pages link to Job Shop Scheduling with Setup Times and Maximal Time-Lags: A Simple Constraint Programming Approach (Q3569929):
Displaying 9 items.
- Scatter search with path relinking for the job shop with time lags and setup times (Q337556) (← links)
- Solving job shop scheduling with setup times through constraint-based iterative sampling: an experimental analysis (Q421447) (← links)
- Temporal constraint satisfaction techniques in job shop scheduling problem solving (Q1273470) (← links)
- An efficient filtering algorithm for the unary resource constraint with transition times and optional activities (Q2197325) (← links)
- Lagrangian bounds for just-in-time job-shop scheduling (Q2456651) (← links)
- Underground mine scheduling of mobile machines using constraint programming and large neighborhood search (Q2664365) (← links)
- Optimization of the integrated problem of employee timetabling and job shop scheduling (Q2669607) (← links)
- Large-scale periodic scheduling in time-sensitive networks (Q2669618) (← links)
- Solving Variants of the Job Shop Scheduling Problem Through Conflict-Directed Search (Q3466772) (← links)