Pages that link to "Item:Q3634987"
From MaRDI portal
The following pages link to Scheduling with Fixed Delivery Dates (Q3634987):
Displaying 29 items.
- Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders (Q257796) (← links)
- Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness (Q319136) (← links)
- Performance guarantees for a scheduling problem with common stepwise job payoffs (Q476886) (← links)
- Two machine scheduling under disruptions with transportation considerations (Q880527) (← links)
- Delivery time quotation and order processing with forbidden early shipments (Q1260740) (← links)
- Single machine scheduling with assignable due dates (Q1613425) (← links)
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence (Q1702665) (← links)
- Complexity of routing problems with release dates and deadlines (Q1754053) (← links)
- Machine scheduling with job delivery coordination (Q1876146) (← links)
- Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty (Q2045022) (← links)
- Two-agent integrated scheduling of production and distribution operations with fixed departure times (Q2076366) (← links)
- Scheduling with generalized and periodic due dates under single- and two-machine environments (Q2115317) (← links)
- Finding efficient make-to-order production and batch delivery schedules (Q2242200) (← links)
- Strong NP-hardness of minimizing total deviation with generalized and periodic due dates (Q2294353) (← links)
- An uncertain programming model for single machine scheduling problem with batch delivery (Q2313751) (← links)
- Single machine scheduling with delivery dates and cumulative payoffs (Q2434318) (← links)
- Integrated production and distribution with fixed delivery departure dates (Q2450622) (← links)
- Logistics scheduling with batching and transportation (Q2482765) (← links)
- Batch scheduling in a two-level supply chain -- a focus on the supplier (Q2491787) (← links)
- Scheduling Identical Parallel Machines with a Fixed Number of Delivery Dates (Q2806964) (← links)
- Integrated Production Scheduling and Delivery Routing: Complexity Results and Column Generation (Q2835699) (← links)
- Monolithic versus hierarchical approach to integrated scheduling in a supply chain (Q3055263) (← links)
- The Coordination of Two Parallel Machines Scheduling and Batch Deliveries (Q3511379) (← links)
- Multi-objective master production scheduling in make-to-order manufacturing (Q3605399) (← links)
- An empirical study of policies to integrate reactive scheduling and control in just-in-time job shop environments (Q4474722) (← links)
- An empirical study of policies to integrate reactive scheduling and control in just-in-time job shop environments (Q4823493) (← links)
- Direct shipping logistic planning for a hub‐and‐spoke network with given discrete intershipment times (Q5488243) (← links)
- Min–max version of single-machine scheduling with generalized due dates under scenario-based uncertainty (Q6094564) (← links)
- Integrated production and transportation scheduling problem under nonlinear cost structures (Q6555171) (← links)