Pages that link to "Item:Q3637369"
From MaRDI portal
The following pages link to Supply Chain Scheduling: Batching and Delivery (Q3637369):
Displaying 50 items.
- Approximation algorithms for the single-machine scheduling with a period of maintenance (Q279822) (← links)
- Online integrated production-distribution scheduling problems without preemption (Q281801) (← links)
- Coordination of production and interstage batch delivery with outsourced distribution (Q296709) (← links)
- Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan (Q319276) (← links)
- On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: minimizing the makespan and delivery cost (Q319441) (← links)
- Batching scheduling in a two-level supply chain with earliness and tardiness penalties (Q328087) (← links)
- Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs (Q337279) (← links)
- A robust optimization approach to reduce the bullwhip effect of supply chains with vendor order placement lead time delays in an uncertain environment (Q350365) (← links)
- A survey of single machine scheduling to minimize weighted number of tardy jobs (Q380558) (← links)
- Approximation algorithms for two-machine open shop scheduling with batch and delivery coordination (Q387811) (← links)
- Single machine batch scheduling with release times and delivery costs (Q398839) (← links)
- A two stage scheduling with transportation and batching (Q456105) (← links)
- Integrated scheduling of production and delivery on a single machine with availability constraint (Q476906) (← links)
- Supply chain scheduling to minimize holding costs with outsourcing (Q490179) (← links)
- Single-machine batch scheduling minimizing weighted flow times and delivery costs (Q614457) (← links)
- Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval (Q726392) (← links)
- Batch sizing and just-in-time scheduling with common due date (Q744646) (← links)
- The coordination of single-machine scheduling with availability constraints and delivery (Q747044) (← links)
- Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries (Q763109) (← links)
- The coordination of scheduling and batch deliveries (Q816348) (← links)
- Single-machine serial-batch delivery scheduling with two competing agents and due date assignment (Q829197) (← links)
- On-line supply chain scheduling problems with preemption (Q872299) (← links)
- Two machine scheduling under disruptions with transportation considerations (Q880527) (← links)
- Single-machine scheduling CON/SLK due window assignment problems with sum-of-processed times based learning effect (Q902764) (← links)
- A zero-inventory production and distribution problem with a fixed customer sequence (Q940901) (← links)
- Minimizing customer order lead-time in a two-stage assembly supply chain (Q940914) (← links)
- Supply chain scheduling: Just-in-time environment (Q940916) (← links)
- Coordinating decentralized local schedulers in complex supply chain manufacturing (Q940924) (← links)
- A branch-and-bound algorithm for single-machine scheduling with batch delivery and job release times (Q941536) (← links)
- Production scheduling with supply and delivery considerations to minimize the makespan (Q958556) (← links)
- The coordination of transportation and batching scheduling (Q965544) (← links)
- Single machine scheduling and due date assignment with positionally dependent processing times (Q1027580) (← links)
- Scheduling with families of jobs and delivery coordination under job availability (Q1034606) (← links)
- On-line integrated production-distribution scheduling problems with capacitated deliveries (Q1042489) (← links)
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines (Q1617275) (← links)
- Integrated production and multiple trips vehicle routing with time windows and uncertain travel times (Q1634047) (← links)
- Integrated production-distribution scheduling problem with multiple independent manufacturers (Q1666043) (← links)
- A branch and bound algorithm to minimize the total weighed number of tardy jobs and delivery costs (Q1667779) (← links)
- Integrated scheduling on a batch machine to minimize production, inventory and distribution costs (Q1698887) (← links)
- A scheduling model of logistics service supply chain based on the time windows of the FLSP's operation and customer requirement (Q1699167) (← links)
- Integrated production and delivery scheduling for multi-factory supply chain with stage-dependent inventory holding cost (Q1699357) (← links)
- Batch delivery scheduling with multiple decentralized manufacturers (Q1718128) (← links)
- Scheduling and common due date assignment on a single parallel-batching machine with batch delivery (Q1723354) (← links)
- Online scheduling on a single machine with grouped processing times (Q1723520) (← links)
- Cost allocation in rescheduling with machine unavailable period (Q1754051) (← links)
- Coordination in a two-stage production system: complexity, conflict and cooperation (Q1762107) (← links)
- Integrated scheduling of production and distribution with release dates and capacitated deliveries (Q1793780) (← links)
- Integrated scheduling of production and distribution for manufacturers with parallel batching facilities (Q1800447) (← links)
- A time scheduling model of logistics service supply chain with mass customized logistics service (Q1925509) (← links)
- A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain (Q1926728) (← links)