The following pages link to (Q3641994):
Displaying 4 items.
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- (Q3072899) (← links)
- (Q3426436) (← links)
- A hybrid genetic algorithm and fuzzy set applied to multi-mode resource-constrained project scheduling problem (Q5174108) (← links)