Pages that link to "Item:Q3763864"
From MaRDI portal
The following pages link to Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines (Q3763864):
Displaying 10 items.
- Solving the parametric bipartite maximum flow problem in unbalanced and closure bipartite graphs (Q492813) (← links)
- Single period, single product newsvendor model with random supply shock (Q596269) (← links)
- Inventory control of service parts in the final phase: A central depot and repair kits (Q1600888) (← links)
- Optimal algorithm to determine the spare inventory level for a repairable-item inventory system (Q1919207) (← links)
- The repair kit problem with imperfect advance demand information (Q2171602) (← links)
- Modelling and solving an FMS part selection problem (Q3824087) (← links)
- Expected time delay in multi-item inventory systems with correlated demands (Q4700650) (← links)
- (Q4897841) (← links)
- The added value of advance demand information for the planning of a repair kit (Q6100688) (← links)
- Inventory Management: An Overview, Canadian Publications, Practical Applications and Suggestions for Future Research (Q6160339) (← links)