Pages that link to "Item:Q3783807"
From MaRDI portal
The following pages link to Two heuristics for the economic lot scheduling problem: An experimental study (Q3783807):
Displaying 12 items.
- New heuristics for solving the economic lot scheduling problem with reworks (Q542588) (← links)
- The economic lot scheduling problem under extended basic period and power-of-two policy (Q968005) (← links)
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes (Q1331612) (← links)
- The economic lot scheduling problem without capacity constraints (Q1772974) (← links)
- The economic lot scheduling problem -- survey and LP-based method (Q1808726) (← links)
- A search heuristic for the sequence-dependent economic lot scheduling problem (Q1848619) (← links)
- Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach (Q3008607) (← links)
- The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies (Q4897086) (← links)
- The Economic Lot and Supply Scheduling Problem Under a Power-of-Two Policy (Q5392023) (← links)
- Evolutionary Computation in Combinatorial Optimization (Q5706010) (← links)
- The economic lot scheduling problem under power-of-two policy (Q5948793) (← links)
- The peak load minimization problem in cyclic production (Q5955976) (← links)