Pages that link to "Item:Q4006897"
From MaRDI portal
The following pages link to Games, Critical Paths and Assignment Problems in Permutation Flow Shops and Cyclic Scheduling Flow Line Environments (Q4006897):
Displaying 4 items.
- Max-plus-based mathematical formulation for cyclic permutation flow-shops (Q622825) (← links)
- Scheduling for two-stage production system with setup and assembly operations (Q1879793) (← links)
- Sequencing and loading of products on a flowline (Q2569078) (← links)
- The permutation flow shop problem with sum-of-completion times performance criterion (Q4279265) (← links)