Pages that link to "Item:Q4245597"
From MaRDI portal
The following pages link to Minimizing the sum of job earliness and tardiness in a multimachine system (Q4245597):
Displaying 11 items.
- Fixed interval scheduling: models, applications, computational complexity and algorithms (Q859906) (← links)
- Parallel machine earliness and tardiness scheduling with proportional weights (Q1870834) (← links)
- An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics (Q2273664) (← links)
- Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain (Q2463495) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization (Q2958668) (← links)
- A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling (Q3163193) (← links)
- Parallel machine scheduling with preference of machines (Q3163231) (← links)
- Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs (Q4363720) (← links)
- Multiple machine JIT scheduling: a tabu search approach (Q5428715) (← links)
- Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties (Q5936755) (← links)