Pages that link to "Item:Q4248933"
From MaRDI portal
The following pages link to A set-processing algorithm for scheduling staff on 4-day or 3-day work weeks (Q4248933):
Displaying 15 items.
- A dynamic programming algorithm for days-off scheduling with sequence dependent labor costs (Q835588) (← links)
- An acyclic days-off scheduling problem (Q862817) (← links)
- An algorithm for single shift scheduling of hierarchical workforce (Q1278468) (← links)
- Sizing and scheduling a full-time and part-time workforce with off-day and off-weekened constraints (Q1374457) (← links)
- Four-day workweek scheduling with two or three consecutive days off (Q1398022) (← links)
- An efficient two-phase algorithm for cyclic days-off scheduling. (Q1406704) (← links)
- Staffing geographically distributed service facilities with itinerant personnel (Q1867100) (← links)
- Shift rostering using decomposition: assign weekend shifts first (Q2018938) (← links)
- Designing an annual leave scheduling policy: case of a financial center (Q2086959) (← links)
- Efficient shift scheduling in the retail sector through two-stage optimization (Q2383107) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)
- Multiple shift scheduling of workforce on four-day workweeks (Q3154403) (← links)
- A Novel Approach for the Nurse Scheduling Problem (Q3627707) (← links)
- A Multiple-Shift Workforce Scheduling Model Under the 4-Day Workweek with Weekday and Weekend Labour Demands (Q4319494) (← links)
- A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE (Q5850791) (← links)