Pages that link to "Item:Q4287984"
From MaRDI portal
The following pages link to Supply management in assembly systems (Q4287984):
Displaying 17 items.
- Managing raw material in supply chains (Q297380) (← links)
- A note on the first moment of makespan in an assembly shop (Q869644) (← links)
- Supply chain models for an assembly system with preprocessing of raw materials (Q877051) (← links)
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times (Q975990) (← links)
- Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm (Q1042216) (← links)
- An optimal \((Q,r)\) policy for a multipart assembly system under stochastic part procurement lead times (Q1278134) (← links)
- Input control in a batch production system with lead times, due dates and random yields (Q1584793) (← links)
- Safety times for multistage assembly system (Q1721490) (← links)
- Supply chain models for an assembly system with preprocessing of raw materials: a simple and better algorithm (Q1789477) (← links)
- Multilevel production systems with dependent demand with uncertainty of lead times (Q1793230) (← links)
- Modeling and analysis of a supply--assembly--store chain (Q2432901) (← links)
- Managing Inventory and Supply Performance in Assembly Systems with Random Supply Capacity and Demand (Q3115427) (← links)
- Optimal supply planning in MRP environments for assembly systems with random component procurement times (Q3541192) (← links)
- On Modeling the Store of an Assembly Shop by Due Date Processes (Q3823400) (← links)
- (Q4499919) (← links)
- Generalized newsboy model to compute the optimal planned lead times in assembly systems (Q4706334) (← links)
- Synchronization in a two‐supplier assembly system: Combining a fixed lead‐time module with capacitated m<scp>ake‐to‐order</scp> production (Q6077483) (← links)