The following pages link to (Q4311717):
Displaying 7 items.
- The just-in-time scheduling problem in a flow-shop scheduling system (Q421784) (← links)
- Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system (Q1652207) (← links)
- A study on the enhanced best performance algorithm for the just-in-time scheduling problem (Q1723298) (← links)
- Earliness--tardiness production planning for just-in-time manufacturing: a unifying approach by goal programming (Q2432869) (← links)
- Punctuality and idleness in just-in-time scheduling (Q2566707) (← links)
- Just-in-time scheduling under scenario-based uncertainty (Q2836525) (← links)
- Scheduling to Maximize the Number of Just-in-Time Jobs: A Survey (Q2958665) (← links)