Pages that link to "Item:Q4398902"
From MaRDI portal
The following pages link to MRP systems under supply and process uncertainty in an integrated shop floor control environment (Q4398902):
Displaying 9 items.
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times (Q975990) (← links)
- MRP and inventories (Q1068698) (← links)
- New lot-sizing formulations for less nervous production schedules (Q1582688) (← links)
- MRP performance effects due to forecast bias and demand uncertainty (Q1600889) (← links)
- Tactical supply chain planning under uncertainty with an application in the wind turbines industry (Q1782187) (← links)
- Re-examining the performance of MRP and kanban material control strategies for multi-product flexible manufacturing systems (Q2508422) (← links)
- Optimal supply planning in MRP environments for assembly systems with random component procurement times (Q3541192) (← links)
- MRP-controlled batch-manufacturing environment under uncertainty (Q4661096) (← links)
- Generalized newsboy model to compute the optimal planned lead times in assembly systems (Q4706334) (← links)