The following pages link to (Q4451582):
Displaying 18 items.
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search (Q702729) (← links)
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems (Q709108) (← links)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- A random key based genetic algorithm for the resource constrained project scheduling problem (Q947946) (← links)
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search. (Q1427560) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)
- Some algorithms of solving minimax multiprocessor scheduling problem (Q2263888) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)
- Genetic algorithm for the resource-constrained project scheduling problem (Q2401044) (← links)
- A hybrid metaheuristic for the resource-constrained project scheduling problem (Q2433434) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling (Q2519076) (← links)
- Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art (Q3432703) (← links)
- A variable neighbourhood search algorithm for the constrained task allocation problem (Q5387420) (← links)
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem (Q5438568) (← links)