Pages that link to "Item:Q4540083"
From MaRDI portal
The following pages link to Project scheduling with multiple modes: A comparison of exact algorithms (Q4540083):
Displaying 30 items.
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP) (Q363579) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid (Q535971) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- Maximising the weighted number of activity execution modes in project planning (Q724006) (← links)
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags (Q929315) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- Differential evolution for solving multi-mode resource-constrained project scheduling problems (Q1010277) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- A note on ``Hierarchical models for multi-project planning and scheduling'' (Q1278323) (← links)
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (Q1296105) (← links)
- Resource-constrained project scheduling. Exact methods for the multi-mode case (Q1327722) (← links)
- An exact algorithm for project scheduling with multiple modes (Q1372766) (← links)
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. (Q1399573) (← links)
- Lower bounds for resource-constrained project scheduling problems. (Q1399575) (← links)
- An exact composite lower bound strategy for the resource-constrained project scheduling problem (Q1652587) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q1807061) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems (Q2467429) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem (Q3598682) (← links)
- Um algoritmo exato para o problema de programação de projetos com custo de disponibilidade de recursos e múltiplos modos (Q3625796) (← links)
- Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms (Q5143361) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)