Pages that link to "Item:Q4545688"
From MaRDI portal
The following pages link to Dynamics of Two- and Three-Worker “Bucket Brigade” Production Lines (Q4545688):
Displaying 15 items.
- Profit maximization in flexible serial queueing networks (Q475122) (← links)
- Bucket brigades revisited: are they always effective? (Q818093) (← links)
- Dynamics of 2-worker bucket brigade assembly line with blocking and instantaneous walk-back (Q833563) (← links)
- Design and control of warehouse order picking: a literature review (Q881508) (← links)
- Bucket brigades with worker learning (Q2432900) (← links)
- Cooperative flow dynamics in production lines with buffer level dependent production rates (Q2484346) (← links)
- On the introduction of an agile, temporary workforce into a tandem queueing system (Q2494533) (← links)
- Bucket brigades on in-tree assembly networks (Q2569073) (← links)
- Optimal dynamic assignment of a flexible worker on an open production line with specialists (Q2572254) (← links)
- Corrective maintenance through dynamic work allocation and pre-emption: case study and application (Q3055406) (← links)
- Some new results on the analysis and simulation of bucket brigades (self-balancing production lines) (Q3114300) (← links)
- An Example and a Proposal Concerning the Correlation of Worker Processing Times in Parallel Tasks (Q3117881) (← links)
- Performance of Bucket Brigades When Work Is Stochastic (Q3635031) (← links)
- A Production Line that Balances Itself (Q4883199) (← links)
- Performance of serial assembly line designs under unequal operator speeds and learning (Q5444572) (← links)