Pages that link to "Item:Q4717140"
From MaRDI portal
The following pages link to Multi-job Cutting Stock Problem with Due Dates and Release Dates (Q4717140):
Displaying 13 items.
- Mathematical models and a heuristic method for the multiperiod one-dimensional cutting stock problem (Q271978) (← links)
- Solving real-world cutting stock-problems in the paper industry: mathematical approaches, experience and challenges (Q296762) (← links)
- Classification and literature review of integrated lot-sizing and cutting stock problems (Q724044) (← links)
- Heuristic algorithm for a cutting stock problem in the steel bridge construction (Q954060) (← links)
- The one-dimensional cutting stock problem with due dates (Q1038325) (← links)
- Solving large-scale time capacitated arc routing problems: from real-time heuristics to metaheuristics (Q1730649) (← links)
- A hybrid feasibility constraints-guided search to the two-dimensional bin packing problem with due dates (Q1754152) (← links)
- Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods (Q1979194) (← links)
- Modeling and solving a real-world cutting stock problem in the marble industry via mathematical programming and stochastic diffusion search approaches (Q2027058) (← links)
- A matheuristic algorithm for the one-dimensional cutting stock and scheduling problem with heterogeneous orders (Q2307325) (← links)
- Two dimensional guillotine cutting stock and scheduling problem in printing industry (Q2676408) (← links)
- Two-Stage Cutting Stock Problem with Due Dates (Q4596454) (← links)
- Heuristic algorithms based on column generation for an online product shipping problem (Q6065593) (← links)