Pages that link to "Item:Q4814095"
From MaRDI portal
The following pages link to Scheduling the production of rolling ingots: industrial context, model, and solution method (Q4814095):
Displaying 15 items.
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources (Q513559) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A two-phase model for planning the production of aluminum ingot (Q1130032) (← links)
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem (Q1654362) (← links)
- Iron ore production scheduling to improve product quality (Q1840860) (← links)
- A multi-objective hot-rolling scheduling problem in the compact strip production (Q1984951) (← links)
- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation (Q2336415) (← links)
- Managing and modelling general resource transfers in (multi-)project scheduling (Q2379662) (← links)
- On Eulerian extensions and their application to no-wait flowshop scheduling (Q2434285) (← links)
- GRASP and path relinking for project scheduling under partially renewable resources (Q2482792) (← links)
- A scatter search algorithm for project scheduling under partially renewable resources (Q2491335) (← links)
- (Q3064888) (← links)
- COMBINING PROCESS SELECTION AND LOT SIZING MODELS FOR PRODUCTION SCHEDULING OF ELECTROFUSED GRAINS (Q3392298) (← links)