Pages that link to "Item:Q4823499"
From MaRDI portal
The following pages link to Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment (Q4823499):
Displaying 24 items.
- Evaluation of supply chain with quality improvement under trade credit and freight rate discount (Q260466) (← links)
- Supply chain coordination with controllable lead time and asymmetric information (Q439339) (← links)
- A stochastic periodic review integrated inventory model involving defective items, backorder price discount, and variable lead time (Q607879) (← links)
- On the inventory model with continuous and discrete lead time, backorders and lost sales (Q967881) (← links)
- Mixed replenishment policy for ATO supply chain based on hybrid genetic simulated annealing algorithm (Q1718690) (← links)
- Effect of timing on reliability improvement and ordering decisions in a decentralized assembly system (Q2150798) (← links)
- Impact of uncertain demand and lead-time reduction on two-echelon supply chain (Q2171379) (← links)
- An optimal mixed batch shipment policy for multiple items in a single-supplier multiple-retailer integrated system (Q2251561) (← links)
- Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction (Q2355104) (← links)
- Time and quantity dependent waiting costs in a newsvendor problem with backlogged shortages (Q2427101) (← links)
- An optimal production and shipment policy for a single-vendor single-buyer integrated system with both learning effect and deteriorating items (Q2997884) (← links)
- An integrated inventory model with ordering cost and setup cost reductions under just-in-time purchasing (Q3008609) (← links)
- An overview of quality, purchasing and just-in-time interactions (Q3021822) (← links)
- A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items (Q3055217) (← links)
- THE LEARNING EFFECT ON SETUP COST REDUCTION FOR MIXTURE INVENTORY MODELS WITH VARIABLE LEAD TIME (Q3528869) (← links)
- (Q4286311) (← links)
- Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system (Q4933646) (← links)
- An Integrated Imperfect Production–Inventory Model with Optimal Vendor Investment and Backorder Price Discount (Q5233848) (← links)
- A two-echelon inventory model with fuzzy annual demand in a supply chain (Q5292945) (← links)
- An alternative model for integrated vendor–buyer inventory under controllable lead time and its heuristic solution (Q5423167) (← links)
- An integrated JIT--PQD model for enhancing buyer--supplier linkage (revised version) (Q5426641) (← links)
- Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain (Q5444638) (← links)
- (Q5862407) (← links)
- Improvement of Quality with the Reduction of Order Processing Cost by Just-In-Time Purchasing (Q5867217) (← links)