The following pages link to (Q4841760):
Displaying 7 items.
- Single machine group scheduling with resource dependent setup and processing times (Q707136) (← links)
- Group sequencing around a common due date (Q937402) (← links)
- Group scheduling with controllable setup and processing times: minimizing total weighted completion time (Q1772970) (← links)
- Vyacheslav Tanaev: contributions to scheduling and related areas (Q2434293) (← links)
- Sequencing with ordered criteria, precedence and group technology constraints (Q2731287) (← links)
- Optimal Sequencing Via Modular Decomposition: Characterization of Sequencing Functions (Q3760291) (← links)
- Single Machine Group Scheduling with Two Ordered Criteria (Q4887789) (← links)