Pages that link to "Item:Q4859580"
From MaRDI portal
The following pages link to A note on minimizing the expected makespan in flowshops subject to breakdowns (Q4859580):
Displaying 6 items.
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function (Q1129910) (← links)
- Two-machine ordered flowshop scheduling under random breakdowns (Q1341394) (← links)
- An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns (Q1598772) (← links)
- Stochastically minimizing total flowtime in flowshops with no waiting space (Q1806645) (← links)
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness (Q2563893) (← links)
- Minimizing makespan on a single machine subject to random breakdowns (Q2583704) (← links)