Pages that link to "Item:Q4868787"
From MaRDI portal
The following pages link to Flowshop Scheduling of Robotic Cells with Job-dependent Transportation and Set-up Effects (Q4868787):
Displaying 16 items.
- Exact methods for the robotic cell problem (Q656059) (← links)
- Cyclic multiple-robot scheduling with time-window constraints using a critical path approach (Q856208) (← links)
- Scheduling in reentrant robotic cells: algorithms and complexity (Q880491) (← links)
- A two-stage flow shop scheduling problem with transportation considerations (Q904289) (← links)
- A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots (Q1265862) (← links)
- A hybrid metaheuristic algorithm to optimise a real-world robotic cell (Q1652331) (← links)
- Resolution of a scheduling problem in a flowshop robotic cell (Q1887770) (← links)
- Scheduling a two-machine robotic cell: A solvable case (Q1897386) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Exact method for robotic cell problem (Q2861503) (← links)
- On-line scheduling of a robotic manufacturing cell with stochastic sequence-dependent processing rates (Q3026720) (← links)
- Scheduling Parts in a Combined Production-transportation Work Cell (Q3483069) (← links)
- Fuzzy Gilmore and Gomory algorithm: Application in robotic flow shops with the effects of job-dependent transportation and set-ups (Q5002310) (← links)
- Machine scheduling with transportation considerations (Q5932281) (← links)
- Makespan minimization for flow-shop problems with transportation times and a single robot (Q5946823) (← links)
- Scheduling in manufacturing with transportation: classification and solution techniques (Q6586212) (← links)