Pages that link to "Item:Q490148"
From MaRDI portal
The following pages link to Multi-project scheduling with two-stage decomposition (Q490148):
Displaying 13 items.
- Maximizing total tardiness on a single machine in \(O(n^2)\) time via a reduction to half-product minimization (Q256707) (← links)
- A multi-stage non-deterministic model for project scheduling under resources constraints (Q721683) (← links)
- A decomposition approach to multi-project scheduling (Q809877) (← links)
- Constrained multi-project planning problems: A Lagrangean decomposition approach (Q1342015) (← links)
- Revenue sharing for resource transfer among projects (Q2027026) (← links)
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem (Q2629594) (← links)
- Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms (Q5143361) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- A robust multi-project scheduling problem under a resource dedication-transfer policy (Q6573375) (← links)
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns (Q6588469) (← links)
- A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty (Q6601552) (← links)