Pages that link to "Item:Q490371"
From MaRDI portal
The following pages link to Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility (Q490371):
Displaying 6 items.
- Coke production scheduling problem: a parallel machine scheduling with batch preprocessings and location-dependent processing times (Q1725594) (← links)
- A heuristic to schedule flexible job-shop in a glass factory (Q1772853) (← links)
- A systematic approach to quality oriented product sequencing for multistage manufacturing systems (Q1793774) (← links)
- Multiproduct batching and scheduling with buffered rework: The case of a car paint shop (Q4632851) (← links)
- Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry (Q5954825) (← links)
- A hybrid genetic algorithm based on reinforcement learning for the energy-aware production scheduling in the photovoltaic glass industry (Q6551123) (← links)