The following pages link to (Q4938774):
Displaying 14 items.
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- Scheduling and constraint propagation (Q697570) (← links)
- Computing redundant resources for the resource constrained project scheduling problem (Q853022) (← links)
- Lower bounds for resource-constrained project scheduling problems. (Q1399575) (← links)
- On linear lower bounds for the resource constrained project scheduling problem. (Q1399576) (← links)
- A linear programming and constraint propagation-based lower bound for the RCPSP (Q1590041) (← links)
- An exact composite lower bound strategy for the resource-constrained project scheduling problem (Q1652587) (← links)
- Redundant cumulative constraints to compute preemptive bounds (Q1686060) (← links)
- PERT scheduling with convex cost functions. (Q1853737) (← links)
- THE LEXICO-BOUNDED FLOW ALGORITHM FOR SOLVING THE MINIMUM COST PROJECT SCHEDULING PROBLEM WITH AN ADDITIONAL LINEAR CONSTRAINT (Q3220333) (← links)
- (Q3426433) (← links)
- Reducing the number of paths in a minimized project-network with given bounds on the durations of activities (Q4575164) (← links)
- On project scheduling with irregular starting time costs (Q5945382) (← links)