Pages that link to "Item:Q4996288"
From MaRDI portal
The following pages link to Multi-mode bi-objective proactive project scheduling optimization considering robust cost (Q4996288):
Displaying 9 items.
- Bi-objective multi-mode project scheduling under risk aversion (Q319785) (← links)
- Bi-objective resource-constrained project scheduling with robustness and makespan criteria (Q850236) (← links)
- Robust optimization models for project scheduling with resource availability cost (Q880580) (← links)
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem (Q992657) (← links)
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem (Q1636886) (← links)
- A biobjective optimization model for deadline satisfaction in line-of-balance scheduling with work interruptions consideration (Q1721280) (← links)
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem (Q1723411) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)