Pages that link to "Item:Q505132"
From MaRDI portal
The following pages link to Flow shop scheduling on 2-machines with setup time and single transport facility under fuzzy environment (Q505132):
Displaying 4 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Survey on fuzzy shop scheduling (Q1794871) (← links)
- Fuzzy Gilmore and Gomory algorithm: Application in robotic flow shops with the effects of job-dependent transportation and set-ups (Q5002310) (← links)
- Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines (Q6193885) (← links)