Pages that link to "Item:Q5058828"
From MaRDI portal
The following pages link to Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm (Q5058828):
Displaying 10 items.
- The new Fundamental Tree Algorithm for production scheduling of open pit mines (Q856303) (← links)
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity (Q958440) (← links)
- Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions (Q1752139) (← links)
- Bi-objective short-term scheduling in a rolling horizon framework: a priori approaches with alternative operational objectives (Q2273666) (← links)
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine (Q2275613) (← links)
- Receding horizon control applied to optimal mine planning (Q2507926) (← links)
- Multi-objective approaches for the open-pit mining operational planning problem (Q2840780) (← links)
- A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines (Q2940058) (← links)
- Short-term open-pit production scheduling optimizing multiple objectives accounting for shovel allocation in stockpiles (Q6159503) (← links)
- Optimization of open-pit mine design and production planning with an improved floating cone algorithm (Q6173792) (← links)