Pages that link to "Item:Q5058931"
From MaRDI portal
The following pages link to Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs (Q5058931):
Displaying 7 items.
- Proportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobs (Q1640602) (← links)
- A two-machine no-wait flow shop problem with two competing agents (Q2075466) (← links)
- A multi-agent system for the weighted earliness tardiness parallel machine problem (Q2257353) (← links)
- Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs (Q2400041) (← links)
- Multitasking scheduling problems with two competitive agents (Q5059462) (← links)
- A note: maximizing the weighted number of just-in-time jobs for a given job sequence (Q6136084) (← links)
- Algorithms for a two-machine no-wait flow shop scheduling problem with two competing agents (Q6621844) (← links)