Pages that link to "Item:Q5058979"
From MaRDI portal
The following pages link to Incorporating preventive maintenance into the <i>m</i>-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study (Q5058979):
Displaying 4 items.
- Considering scheduling and preventive maintenance in the flowshop sequencing problem (Q883296) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems (Q2675651) (← links)
- A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness (Q6193912) (← links)