Pages that link to "Item:Q514374"
From MaRDI portal
The following pages link to Spare parts inventory control under system availability constraints (Q514374):
Displaying 35 items.
- Pooling of spare parts between multiple users: how to share the benefits? (Q297192) (← links)
- A spare parts model with cold-standby redundancy on system level (Q622150) (← links)
- A new partial pooling structure for spare parts networks (Q1042257) (← links)
- Inventory control of spare parts using a Bayesian approach: a case study. (Q1420456) (← links)
- Traditional or additive manufacturing? Assessing component design options through lifecycle cost analysis (Q1651711) (← links)
- A survey of maintenance and service logistics management: classification and research agenda from a maritime sector perspective (Q1652367) (← links)
- Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems (Q1683067) (← links)
- Transshipment policies for systems with multiple retailers and two demand classes (Q1703463) (← links)
- Exploiting elapsed time for managing intermittent demand for spare parts (Q1751732) (← links)
- A multi-item approach to repairable stocking and expediting in a fluctuating demand environment (Q1752175) (← links)
- Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures (Q1752179) (← links)
- Joint condition-based maintenance and inventory optimization for systems with multiple components (Q1752788) (← links)
- OR in spare parts management: a review (Q1754102) (← links)
- Modeling diminishing marginal returns in a hierarchical inventory system of repairable spare parts (Q1960306) (← links)
- Spare parts inventory management: new evidence from distribution fitting (Q1991269) (← links)
- Integrated planning of spare parts and service engineers with partial backlogging (Q2014591) (← links)
- Integrated location and inventory planning in service parts logistics with customer-based service levels (Q2183335) (← links)
- A review of operational spare parts service logistics in service control towers (Q2282527) (← links)
- A sorting based efficient heuristic for pooled repair shop designs (Q2297570) (← links)
- Operational level planning of a multi-item two-echelon spare parts inventory system with reactive and proactive interventions (Q2301951) (← links)
- Contract design for equipment after-sales service with business interruption insurance (Q2301953) (← links)
- Optimal allocation policy for a multi-location inventory system with a quick response warehouse (Q2450625) (← links)
- Evaluation of time-varying availability in multi-echelon spare parts systems with passivation (Q2572815) (← links)
- Stockout risk estimation and expediting for repairable spare parts (Q2669670) (← links)
- Operational planning in service control towers -- heuristics and case study (Q2672121) (← links)
- (Q3471810) (← links)
- A methodology for integrated critical spare parts and insurance management (Q4628723) (← links)
- Probabilistic resource pooling games (Q4632990) (← links)
- (Q5143883) (← links)
- Maintaining systems with heterogeneous spare parts (Q5194746) (← links)
- Optimal control policies for an inventory system with commitment lead time (Q5226164) (← links)
- Analysis and Algorithms for Service Parts Supply Chains (Q5701576) (← links)
- Simulation-based variable neighborhood search for optimizing skill assignments in multi-server facilities with inventories (Q6551153) (← links)
- Discussion of: ``Signature-based models of preventive maintenance'' (Q6581458) (← links)
- Joint optimization of location and allocation for spare parts depots under \((r,Q)\) inventory policy (Q6647097) (← links)