Pages that link to "Item:Q5176352"
From MaRDI portal
The following pages link to Synchronized Two-Stage Lot Sizing and Scheduling Problem in Automotive Industry (Q5176352):
Displaying 3 items.
- Optimization framework for process scheduling of operation-dependent automobile assembly lines (Q691498) (← links)
- The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model (Q1664892) (← links)
- The integrated lot sizing and cutting stock problem in an automotive spring factory (Q2056644) (← links)