Pages that link to "Item:Q5196967"
From MaRDI portal
The following pages link to Integrated modeling of material delivery and container pickup problem for aircraft moving assembly line (Q5196967):
Displaying 3 items.
- Airfreight forwarder shipment planning: A mixed 0-1 model and managerial issues in the integration and consolidation of shipments (Q2519081) (← links)
- Study of the method of material delivery in assembly process with uncertain processing time (Q2823843) (← links)
- An integrated material handling system for a truck assembly plant (Q3156530) (← links)