Pages that link to "Item:Q5410240"
From MaRDI portal
The following pages link to Simulated Annealing and Tabu Search for Discrete-Continuous Project Scheduling with Discounted Cash Flows (Q5410240):
Displaying 8 items.
- Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results (Q744660) (← links)
- Solving the discrete-continuous project scheduling problem via its discretization (Q1401646) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- On a certain class of power- and energy-related scheduling problems (Q2422748) (← links)
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach (Q2468474) (← links)
- Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap (Q2666666) (← links)
- Comparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing Rates (Q3188762) (← links)