Pages that link to "Item:Q5428993"
From MaRDI portal
The following pages link to Minimizing makespan for two parallel machines with job limit on each availability interval (Q5428993):
Displaying 9 items.
- Scheduling two parallel machines with machine-dependent availabilities (Q342363) (← links)
- Minimizing total completion time on a single machine with a flexible maintenance activity (Q613512) (← links)
- Makespan minimization for parallel machines scheduling with multiple availability constraints (Q744645) (← links)
- Minimizing the makespan on two identical parallel machines with mold constraints (Q1722974) (← links)
- Makespan minimization for two parallel machines with an availability constraint (Q1887910) (← links)
- A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates (Q1956018) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Two parallel machines scheduling with two-vehicle job delivery to minimize makespan (Q2296256) (← links)
- Scheduling with cardinality dependent unavailability periods (Q6565385) (← links)